Classic Package
Payment Plan:
35% upon contract signing
30% after Phase 1 (electrical, plumbing & AC rough-ins)
25% after Phase 2 (tiling & gypsum works)
10% after Phase 3 (painting & doors installation)
Cost Structure:
17.5% supervision fee on total finishing costs (materials + labor)
Package Specifications:
1. Electrical Works
18-circuit Venus distribution board
Magic junction boxes & Mostafa Mahmoud conduits
AC circuit rough-ins (wiring only)
Certified Swedish cables
Venus switches & sockets (lifetime warranty)
Complete telephone & satellite wiring
Intercom box installation
Exhaust fan outlets near kitchen/bathroom windows
Dedicated circuit breakers for appliances
Waleed spotlights for gypsum areas
2. Plumbing Works
Bathroom waterproofing (glass fiber layer + cold insulation + Ansomat membrane)
Bathroom & kitchen plumbing rough-ins
Sherif/Techno Therm pipes (with warranty)
Bathroom fixtures (max 4000 EGP per bathroom)
Faucets (max 3000 EGP per bathroom)
Bathtub OR shower cabin for one bathroom (max 4000 EGP)
3. Ceiling Works
Full-unit ceiling screeding
Gypsum board for living room & hallway only
Crown molding for rooms & hallway
FUTEC molding for bathrooms & kitchen
4. Doors
Metal-faced main door
Internal doors (MDF-coated musky wood)
Paint finish (Astra or lacquer as preferred)
5. Tiles
Living room & hallway tiles (225 EGP/sqm)
Other areas tiles (150 EGP/sqm)
Cement, sand & screeding materials included
6. Painting
Water-based sealer
3 putty coats + 1 base coat + 2 finish coats
GLC brand paints
1 feature wall (fabric/wallpaper) per space
Silver Package
Payment Plan:
35% upon contract signing
30% after Phase 1 (electrical, plumbing, AC setup)
25% after Phase 2 (tiling, gypsum board work)
10% after Phase 3 (painting, door installation)
Cost Structure:
17.5% supervision fee on total finishing works (materials + labor)
Package Inclusions:
1. Electrical Works:
18-line Venus distribution board
Magic boxes & Mostafa Mahmoud conduits
Full-unit AC electrical setup (wiring only)
Swedish or Musk Saudi certified cables
Hager switches & sockets (lifetime warranty)
Telephone, satellite & internet wiring (living room & master bedroom)
Intercom box setup
Router installation in hallway
TV divider in hallway & master bedroom
Exhaust fan outlets near kitchen & bathroom windows
Dedicated breakers for water heaters, washing machines & AC units
Waleed spotlights for gypsum board areas
Emergency lighting in living room & hallway
2. Plumbing Works:
Waterproofing for bathrooms (glass fiber layer + cold insulation + Ansomat membrane)
Bathroom & kitchen plumbing setup
Sherif or Techno Therm pipes (with warranty certificate)
Bathroom fixtures (sink & base, max 6000 EGP per bathroom)
Faucet installation (max 5000 EGP per bathroom)
Internal drainage for AC units
Bathtub (shower cabin optional) with glass enclosure for one bathroom (max 6000 EGP)
3. Ceiling Works:
Full-unit ceiling screeding
Complete gypsum board installation (covering entire unit area)
Red gypsum board for kitchens, green for bathrooms
4. Doors:
Main door installation
Internal doors (MDF-coated musky wood)
5. Tiles & Marble:
Living room & hallway tiles (350 EGP/sqm)
Floor & wall tiles for remaining areas (200 EGP/sqm)
Cement, sand & screeding materials supply
Marble thresholds between rooms + exterior doorstep
6. Painting:
Water-based sealer
3 putty coats for entire unit
1 base coat + 2 final finish coats
Washable GLC brand paints
2 accent walls (fabric/wallpaper/stone, max 10 sqm total)
7. Windows:
UPVC windows for kitchen & bathrooms (with exhaust fan cutouts)
Gold Finishing Package
Payment Plan
35% upon contract signing
30% after Phase 1 (electrical, plumbing & AC rough-ins)
25% after Phase 2 (tiling & gypsum works)
10% after Phase 3 (painting & doors installation)
Cost Structure
17.5% supervision fee on total finishing costs (materials + labor)
Premium Package Specifications
1. Electrical Works
24-circuit Venus distribution board
Magic junction boxes & Mostafa Mahmoud conduits
Complete AC installation (wiring + freon piping)
Certified Swedish/Saudi cables
Venus/Chance switches & sockets (lifetime warranty)
Full-unit telephone, satellite & internet wiring
HD TV cable from TV console to living areas
Intercom system installation
Router setup in hallway
TV signal dividers in hallway, master bedroom & living room
Exhaust fan outlets near kitchen/bathroom windows
Dedicated circuit breakers for appliances
Waleed spotlights for gypsum areas
Emergency lighting throughout unit
Sound system pre-wiring
2. Plumbing Works
Premium bathroom waterproofing (glass fiber + cold insulation + Ansomat + Sika 107)
Bathroom & kitchen plumbing with German BR/Smart Home or Techno Therm pipes (with warranty)
Bathroom fixtures (max 8000 EGP per bathroom)
Waterfall shower system
Premium faucets (max 7000 EGP per bathroom)
AC drainage system
Bathtub with chassis OR tempered glass shower cabin (max 8000 EGP for one bathroom)
3. Ceiling Works
Full-unit ceiling screeding
Complete gypsum board installation (including built-in shelves)
Red gypsum board for kitchens, green for bathrooms
4. Doors
Full-cladding Turkish main door
Internal doors (MDF-coated musky wood)
Premium paint finish (Astra or lacquer)
Hinge installation (customer provides handles)
5. Tiles & Marble
Living room & hallway porcelain tiles (625 EGP/sqm)
Premium tiles for other areas (300 EGP/sqm)
Cement, sand & screeding materials included
Marble thresholds between rooms + exterior doorstep
6. Painting & Wall Treatments
Water-based sealer
3 putty coats + 1 base coat + 2 finish coats
Washable Jotun paints
2 feature walls (fabric/wallpaper including one 3D wall)
Stone cladding (max 10 sqm) OR 3D panels
Wood paneling for entrance door + one decorative wall (max 15 sqm)
CNC decorative elements in hallway/living room (max 15 sqm)
7. Windows
UPVC windows for kitchen & bathrooms (with exhaust fan cutouts)
Platinum Finishing Package
Exclusive Payment Plan
25% upon contract signing
25% after Phase 1 (electrical, plumbing & AC rough-ins)
25% after Phase 2 (tiling & gypsum works)
20% after Phase 3 (painting & doors installation)
5% upon final handover
Elite Cost Structure
15% supervision fee on total finishing costs (materials + labor)
Luxury Package Specifications
1. Premium Electrical Works
24-circuit Venus distribution board
Magic junction boxes & Mostafa Mahmoud conduits
Complete AC installation (wiring + freon piping)
Certified Swedish/Saudi cables
Venus/Chance switches & sockets (lifetime warranty)
Smart home pre-wiring (HD TV, full-unit networking)
Video intercom system installation
Advanced router setup in hallway
TV signal optimization in key areas
Premium appliance circuits
Waleed spotlights with smart controls
Emergency lighting system
Integrated sound system
Full-unit shutter automation
Dressing room & kitchen LED outlets
Custom LED profile lighting
Dedicated AC refrigerant piping
2. Luxury Plumbing Works
Elite waterproofing system (Sika 107 + triple-layer insulation)
German BR/Smart Home pipes with extended warranty
Grohe/Ideal Standard fixtures (max 6000 EGP per set)
Ideal Standard faucets (4000 EGP value)
Premium waterfall shower system
AC condensation management
French-accessorized shower cabin + bathtub (7000 EGP value)
3. Designer Ceiling Solutions
Full-unit premium gypsum board with built-in shelving
Specialty boards (red for kitchens, green for bathrooms)
4. Executive Door Package
11cm full-cladding Turkish main door
Premium ready-made Turkish interior doors
5. Luxury Flooring & Walls
Imported porcelain/selected marble (600 EGP/sqm)
Premium tiles or HDF flooring (200 EGP/sqm)
Marble thresholds + exterior doorstep
Complete cement/screeding package
6. Artisan Painting & Finishes
Advanced water sealing
4 putty layers + premium base/finish coats
Washable Jotun paints
3 designer feature walls (including 3D options)
15 sqm stone cladding or 3D panels
30 sqm customizable decor (LED profiles/wood/stone alternatives)
7. Premium Windows
UPVC windows with integrated exhaust systems
Super VIP Package
Payment Schedule:
- 25% of the total cost upon contract signing.
- 25% upon completion of Phase 1 (electrical, plumbing, and AC installation works).
- 25% upon completion of Phase 2 (ceramic and gypsum board works).
- 20% upon completion of Phase 3 (painting, installation of internal doors, and apartment main door).
- 5% upon final handover, Insha’Allah.
Direct Cost System + Supervision Fee:
- A 15% supervision fee is calculated on the direct cost of finishing works (materials + labor).
Electrical Works Payment Schedule:
- Venus 24-line electrical panel.
- Mustafa Mahmoud magic boxes and conduits.
- Full apartment AC electrical wiring and Freon installation.
- Certified Swedish or Saudi Mas cables (or equivalent).
- Venus or Shansi plugs and switches with lifetime warranty.
- Telephone circuit for the entire apartment.
- Satellite dish circuit for the entire apartment.
- Internet circuit for the entire apartment.
- HD cable from TV location to the nearest seating area in the reception and living room.
- Supply and installation of visual intercom.
- Router installation in the hallway.
- Smoke detectors in the hallway and master bedroom.
- Power sockets for kitchen and bathroom exhaust fans.
- Dedicated AC switches for heaters, washing machines, and air conditioners.
- Supply and installation of LED spotlights for gypsum board ceilings.
- Emergency lighting for the entire apartment.
- Supply and installation of sound system.
- Full apartment shutter installation.
- Electrical outlets for the dressing room and kitchen LED lighting.
- Custom LED profile based on client’s choice.
- Freon piping for the entire apartment (excluding back-to-back facades).
Plumbing Works
- Supply and installation of bathroom moisture insulation materials with a cement screed layer for bathroom floors (cement bottle neck + cold insulation + Insomat insulation + Sika 107).
- Plumbing installation for bathrooms and kitchen.
- Pipes used: German BR or Smart Home with a warranty certificate provided to the client.
- Plumbing finishing:
- (2) Grohe or Ideal concealed cisterns.
- Wall-mounted toilet and Duavit basin (up to 6,000 EGP per set).
- Installation of Ideal Standard mixers (4,000 EGP) + shower unit.
- Internal drainage for air conditioners.
- Installation of a bathtub chassis and shower cabin with French accessories (up to a specified limit).
Doors
- Supply and installation of a fully armored Turkish main door (11 cm thick).
- Supply and installation of ready-made Turkish internal doors.
Ceilings
- Gypsum board installation for the entire unit + gypsum board library.
- Red gypsum board for kitchens and green gypsum board for bathrooms.
Ceramic and Marble Works
- Supply and installation of imported ceramic, porcelain, or marble (Breccia, Emperador, Carrara, or Beige Classic) for the reception and hallway (600 EGP/m²).
- Supply and installation of ceramic for the rest of the apartment (walls and floors) or HDF for rooms (200 EGP/m²).
- Supply of cement, sand, bonding materials, and all related items.
- Supply and installation of marble thresholds between rooms + external threshold at the apartment entrance.
Windows
- Supply and installation of UPVC windows for the entire apartment, including kitchen and bathroom windows with exhaust fan provisions.
Painting Works
- Water-based primer coat.
- Four layers of putty for the entire apartment.
- One undercoat layer.
- Two final finishing coats.
- Washable Jotun paints used.
- Three velvet sides or wallpaper, including one 3D room.
- Decorative stone (up to 15 m²) or 3D tiles.
- Additional decor based on client’s choice (LED profile, wood cladding, marble or wood alternatives) up to 30 m².
Ultra Super VIP Package
Payment Schedule:
25% of the total cost upon contract signing.
25% upon completion of Phase 1 (electrical, plumbing, and AC installation works).
25% upon completion of Phase 2 (ceramic and gypsum board works).
20% upon completion of Phase 3 (painting, installation of internal doors, and apartment main door).
5% upon final handover, Insha’Allah.
Direct Cost System + Supervision Fee:
A 15% supervision fee is calculated on the direct cost of finishing works (materials + labor).
Electrical Works
Venus 24-line electrical panel.
Mustafa Mahmoud magic boxes and conduits.
Full apartment AC electrical wiring and Freon installation.
Certified Swedish or Saudi Mas cables (or equivalent).
Venus or Shansi plugs and switches with lifetime warranty.
Telephone circuit for the entire apartment.
Satellite dish circuit for the entire apartment.
Internet circuit for the entire apartment.
HD cable from TV location to the nearest seating area in the reception and living room.
Supply and installation of visual intercom.
Router installation in the hallway.
Smoke detectors in the hallway and master bedroom.
Power sockets for kitchen and bathroom exhaust fans.
Dedicated AC switches for heaters, washing machines, and air conditioners.
Supply and installation of LED spotlights for gypsum board ceilings.
Emergency lighting for the entire apartment.
Supply and installation of sound system.
Full apartment shutter installation.
Electrical outlets for the dressing room and kitchen LED lighting.
Custom LED profile based on client’s choice.
Freon piping for the entire apartment (excluding back-to-back facades).
Plumbing Works
Supply and installation of bathroom moisture insulation materials with a cement screed layer for bathroom floors (cement bottle neck + cold insulation + Insomat insulation + Sika 107).
Plumbing installation for bathrooms and kitchen.
Pipes used: German BR or Smart Home with a warranty certificate provided to the client.
Plumbing finishing:
(2) Grohe or Ideal concealed cisterns.
Wall-mounted toilet and Duavit basin (up to 6,000 EGP per set).
Installation of Ideal Standard mixers (4,000 EGP) + shower unit.
Internal drainage for air conditioners.
Installation of a bathtub chassis and shower cabin with French accessories (up to 7,000 EGP).
Doors
Supply and installation of a fully armored Turkish main door (11 cm thick).
Supply and installation of ready-made Turkish internal doors.
Ceramic and Marble Works
Supply and installation of imported ceramic, porcelain, or marble (Breccia, Emperador, Carrara, or Beige Classic) for the reception and hallway (600 EGP/m²).
Supply and installation of ceramic for the rest of the apartment (walls and floors) or HDF for rooms (200 EGP/m²).
Supply of cement, sand, bonding materials, and all related items.
Supply and installation of marble thresholds between rooms + external threshold at the apartment entrance.
Windows
Supply and installation of UPVC windows for the entire apartment, including kitchen and bathroom windows with exhaust fan provisions.
Painting Works
Water-based primer coat.
Four layers of putty for the entire apartment.
One undercoat layer.
Two final finishing coats.
Washable Jotun paints used.
Three velvet sides or wallpaper, including one 3D room.
Decorative stone (up to 15 m²) or 3D tiles.
Additional decor based on client’s choice (LED profile, wood cladding, marble or wood alternatives) up to 30 m².